From c69f21296c84a7d68a890dbbeede01fa99afddfd Mon Sep 17 00:00:00 2001 From: Eric Bollengier Date: Tue, 29 Mar 2011 09:38:45 +0200 Subject: [PATCH] Fix #1711 about default max run time --- docs/manuals/en/main/dirdconf.tex | 3 ++- 1 file changed, 2 insertions(+), 1 deletion(-) diff --git a/docs/manuals/en/main/dirdconf.tex b/docs/manuals/en/main/dirdconf.tex index 28aee4c5..06b2fc0c 100644 --- a/docs/manuals/en/main/dirdconf.tex +++ b/docs/manuals/en/main/dirdconf.tex @@ -931,7 +931,8 @@ chapter}{basejobs} for more information. \index[dir]{Directive!Max Run Time} The time specifies the maximum allowed time that a job may run, counted from when the job starts, ({\bf not} necessarily the same as when the - job was scheduled). + job was scheduled). By default, the Director will let a job running during + 6 days. \item [Incremental|Differential Max Wait Time = \lt{}time\gt{}] \index[dir]{Incremental Wait Run Time} -- 2.39.5