- Bug: if a job is manually scheduled to run later, it does not appear
in any status report and cannot be cancelled.
-Regression tests (Scott):
+Regression tests:
- Add Pool/Storage override regression test.
- Add delete JobId to regression.
- Add a regression test for dbcheck.