Using \textbf{Full/Diff/Incr Max Run Time}, it's now possible to specify the
maximum allowed time that a job can run depending on the level.
-\addcontentsline{lof}{figure}{Job time control directives}
-\includegraphics{\idir different_time.eps}
+\begin{figure}[htbp]
+ \centering
+ \includegraphics[width=13cm]{\idir different_time.eps}
+ \caption{Job time control directives}
+\end{figure}
\subsection{Statistics Enhancements}
\index[general]{Statistics Enhancements}